Let’s assume that you’ve decided that it’s about time you got that new pool installed. So, what’s the first thing that comes to mind? How much it’ll cost and how long before I can dip my toes in it, right? Well, the cost can really fluctuate based on a number of factors, but when it comes to how long does it take to build a pool – the answer is a little bit simpler.

What Are The Contributing Factors?

Source: neavegroup.com

Several things come into play when it comes to building a pool, and it all starts with a plan. How long will the project take will depend on whether you want a new pool or do you want to rebuild an old one. For the sake of argument – let’s say you’re building a new one.

Next up, you’ll have to decide what kind of pool you want. You can choose between concrete or fiberglass and in-ground or above-ground pool. After that, it’s only a matter of settling the paperwork, deciding where you want the pool and choosing your Newcastle pool builder and seeing when can they start.

How Much Does The Whole Process Take?

Source: popularmechanics.com

Well, the whole process usually lasts somewhere between two to six three, sometimes even more. However, not every pool is the same.

The major portion of that time period is spent on getting the design right and getting all the necessary permits, and settling the paperwork. If you’re lucky – you can be done with this within a week, but sometimes, this process can take over a month.

Now, let’s get into details.

How Long Will It Take To Build A Concrete Pool?

Source: leisurepoolsusa.com

First up, if you want a concrete pool – you’ll have to wait at least another month after you’ve done with the design and permits. The excavation process will only take a day or two, but laying down the concrete and letting it cure will take a month. After that’s done, you have to do all the plumbing, coping, tiling, paving, fencing and so on. All of this could easily last a month or two. When you add all of that together, you get an average of four to six months for a concrete pool to be built.

How Long Will It Take To Build A Fibreglass Pool?

Source: leisurepools.eu

Once again, you will have to wait a couple of weeks to get all the necessary permits, but once you’re done with that – it’s smooth sailing. The excavation (if you’re going for an in-ground pool) will take about a week, maybe even less. Installation of the pool and everything that goes with it will take about a day or two, and by the 10th day – you’ll be swimming laps.

Fiberglass pools come preassembled, so, it would take an experienced New South Wales pool builder about a week to build you a new pool. It could take up to 10 days, but rarely longer than that. Of course, that’s the post-permits part of the process. If you count that in – it’s closer to a month, month and a half.